Operational Notes for AIS / Serial System
Date: 2026-02-17
Logos V3 migration mode
- Full V3 structure scaffolded into Theophysics.
- Content import is intentionally incremental (small batches).
- Do not bulk-import all V3 folders in one run.
- Archive destination for cleanup/staging is
T:\ARCHIVE\R_20260217_0934. - Keep
_STALE_PARTIAL_REVIEW_DROP_20260217_092129as non-canonical legacy residue until a dedicated long-path delete pass.
Next batch candidates
- V3 paper line complete (
V3_P00throughV3_P14) andLogos Storypresent. - Next phase: site build tracks (Axioms site + Master Equation site).
- Next phase: image insertion + per-image explanation + axiom citation pass.
- Next phase: math-consistency verification + appendix assembly for full Logos corpus.
Canonical Hub: CANONICAL_INDEX