Operational Notes for AIS / Serial System

Date: 2026-02-17

Logos V3 migration mode

  • Full V3 structure scaffolded into Theophysics.
  • Content import is intentionally incremental (small batches).
  • Do not bulk-import all V3 folders in one run.
  • Archive destination for cleanup/staging is T:\ARCHIVE\R_20260217_0934.
  • Keep _STALE_PARTIAL_REVIEW_DROP_20260217_092129 as non-canonical legacy residue until a dedicated long-path delete pass.

Next batch candidates

  1. V3 paper line complete (V3_P00 through V3_P14) and Logos Story present.
  2. Next phase: site build tracks (Axioms site + Master Equation site).
  3. Next phase: image insertion + per-image explanation + axiom citation pass.
  4. Next phase: math-consistency verification + appendix assembly for full Logos corpus.

Canonical Hub: CANONICAL_INDEX

Ring 2 — Canonical Grounding

Ring 3 — Framework Connections